Municipal Business Hours: Mon – Fri: 07h30 – 16h30

Advert for Quality Assurance, Cash management, Assets verification, Travelling Agent, Hygiene material, source funding and panel of infrastructure consultants

Bids are hereby invited in terms of Section 83 of the Municipal Systems Act, Act 32 of 2000 (as amended) and Sections 110 and 112 of the Municipal Finance Management Act, Act 56 of 2003.

  • FIN 01/2024 – Appointment of a panel for the provision of quality assurance on accounting services for the period of three (3) years –
  • FIN 02/2024 – Provision for cash management services for the period of three(3) years
  • FIN 03/2024 – Appointment of a panel of service providers to conduct the physical verification, condition assessment including calculating, componantization of immovable assets and valuation of heritage assets for period of three (3) years

Read More

Intention to Award of Stones, Premix, Ready-Mix Products and Contractors for Infrastructure Project – 4GB – 4CE or Higher Description Attached Files

INTENTION TO AWARD

  1. Intention to Award for Contract No: 8/1/1/4/16 – TEC 09/2023 Supply and Delivery of Stones Products for the Period of Three Years.
  2. Intention to Award for Contract No: 8/1/1/4/15 – TEC 08/2023 Supply and Delivery of Premix Products for the Period of Three Years.
  3. Intention to Award for Contract No: 8/1/1/4/14 – TEC 07/2023 Supply and Delivery of Ready – Mix Products for the Period of Three Years.
  4. Intention to Award for Contract No: 8/1/1/4/11 – TEC 05/2023 Panel of Contractors for Infrastructure Projects (4 GB -4 EC – Higher) For the Period of Three Years.

Read More

Extention of Validity Period: Panel of Contractors for Infrastructure Projects

Request for the Extention of Validity Period: Contract No. 8/1/1/4/12 – TEC25/2023: Panel of Contractors for Infrastructure Projects (4GB –  4CE and Higher) for a Period of Three Years.

Read More

Panel of Service Providers for Re-Branding Services and Panel of Consultants

  • TEC 10/2023 – Panel of Consultants for Infrastructure Projects for the period of three years
  • SOC 01/2023 – Panel of Service Providers for Re-branding Services of the Okhahlamba Local Municipality for the period of 12 months

Read More

Intention Award Provision of Services on Electrification Projects for the Period of 3 Years

Intention to Award for Contract No: 8/1/1/4/4- TEC 01/2023, Provision of Professional Services on Electrification Project for the Period of Three Years.

In terms of section 49 of the Municipal Supply chain Management Regulation No 27636 of 2000. The awarding for contract will be confirmed in writing after fourteen (14) calendar days from (23 May 2023 to 07 June 2023).

Noting that the intention to appoint thereof has followed all Supply Chain Management due process, and as such any person found to have contracted or solicited the bidder should be reported to the Municipal Manager with immediate effect.

Read More

Panel of Contractors for Various Projects & MFM Programme

  • COR04/2023 – Municipal Finance Management Programme for the period of twelve (12) months.
  • MM01/2023 – Panel of Specialized Legal Services for the period of three years.
  • TEC 02/2023 – Panel of Electrical Engineering Contractors (Grade 1EP- 3EP) for the period of three years.
  • TEC03/2023 – Panel of Electrical Engineering Contractors (Grade 4EP – Higher) for the period of three years
  • TEC04/2023 – Panel of contractors for Infrastructure Projects (1GB/1CE- 3GB/3CE) for the period of three years
  • TEC05/2023 – Panel of contractors for Infrastructure Projects (4GB/4CE – Higher) for the period of three ears

Read More

Construction of the Light Industrial Hub

The Construction of the Light Industrial Hub – Sub-Contracting Phase 1

Read More

Appointment of services provider to undertake the construction in Moyeni B Rural Housing Project

Appointment of services provider to undertake the construction and beneficiary administration of the remaining top structures and VIPs for 455 houses at various stages of construction in Moyeni B Rural Housing Project of ward 8 for a period of 36 months.

Read More

Moyeni, Sandlwana and Okhombe Electrification

Moyeni, Sandlwana and Okhombe Electrification

  • TEC16/2021
  • TEC15/2021
  • TEC14/2021

Read More

BIDS-CLOSING-EXTENSION-2021-07-12

BIDS-CLOSING-EXTENSION-2021-07-12

Read More